How to Keep Healthcare Construction on Schedule: Tips and Best Practices

Updated: 5 days ago

Building hospitals and medical office buildings isn’t like any other construction project. These facilities need to be completed on time while meeting strict safety, regulatory, and operational requirements. Any delays can mean financial losses and disruptions to patient care. That’s why smart scheduling is essential—it keeps projects on track and within budget.


Unique Challenges in Healthcare Construction Scheduling


  1. Regulatory Compliance – Hospitals and medical buildings have to follow strict regulations, including infection control, safety standards, and accessibility requirements. That means scheduling needs to include time for inspections and approvals.


  2. Medical Equipment Coordination – Healthcare facilities require specialized equipment like MRI machines and surgical suites. These need to be installed at specific times, and they often have long lead times. Scheduling must account for this to avoid delays.


  3. Working in Active Healthcare Facilities – Renovation projects inside operating hospitals or clinics require extra planning to minimize disruptions. This often means phased construction, after-hours work, and temporary setups to keep things running smoothly.


  4. Infection Control and Safety – Construction in healthcare environments must keep patients and staff safe. Scheduling should include time for setting up dust control barriers, negative air pressure systems, and following Infection Control Risk Assessment (ICRA) guidelines.


  5. Supply Chain Issues – Many healthcare construction materials and equipment have long lead times. Good scheduling accounts for this, ensuring materials arrive when needed to avoid costly delays.


Best Practices for Keeping Healthcare Projects on Track


  1. Plan Everything in Advance – Bring in key stakeholders early—hospital administrators, contractors, and medical staff—to align on goals, timelines, and challenges before construction starts.


  2. Use a Phased Approach – If you’re working on an active hospital, break the project into phases to keep things running smoothly. This approach sets clear milestones and prevents unnecessary disruptions.


  3. Leverage Technology – Tools like Building Information Modeling (BIM) and scheduling software (e.g., Primavera P6, Microsoft Project) help teams visualize timelines, track progress, and allocate resources effectively.


  4. Stay in Close Communication with Healthcare Staff – Regular check-ins with hospital staff help prevent surprises and ensure that construction work doesn’t interfere with critical medical operations.


  5. Plan for the Unexpected – Regulatory delays, supply chain issues, and unforeseen structural problems can throw a wrench in the schedule. Building in buffer time can help absorb these challenges without derailing the project.


  6. Make Sure You Have the Right People – Healthcare construction often requires specialized labor, such as medical gas installers. Scheduling should ensure the right workers are available when needed to keep the project moving.



Final Thoughts


Staying on schedule with healthcare construction is all about planning, coordination, and flexibility. By addressing unique challenges and using smart scheduling strategies, project teams can keep hospitals and medical office buildings on track—ensuring they open on time and serve patients as planned.

 
 
 